Thursday, October 21, 2010

Dry Fitting the Diaz Tower Stair

The stair treads have arrived from the midwest so the tower stair at the Diaz Farm Family Unit can be drive fit at long last.  After this dryfitting, the stair will be disassembled and hot dip galvanized (a procedure that should take two weeks).  The smaller members one sees in this shot are simply tack welded struts required for the initial assembly.

No comments:

Post a Comment