Saturday, May 8, 2010

Installation of the Steel

Kauth Brothers (Steel Fabricators) and Shook and Waller (Carpenters) are installing the tower.  The main tower supports are steel.  The floor systems are predominantly wood.  The exterior stairway that will eventually wrap around the outside of the tower will be steel again for waterproofing reasons.  This combination of building systems requires the two subs work closely together.

No comments:

Post a Comment