The last wall panel was put in place on the Maidman residence yesterday. After placing the continuous top plate and installing a wedge pieces above this, the roof panels will be put in place. If you would like to watch this video in full screen click on the YouTube link in the lower right hand corner of the video and you should be taken to youtube where you have full YouTube functionality.
Friday, December 24, 2010
Saturday, December 18, 2010
Wrestling with Rain and Panels
Chapman Construction has been contending with a wet fall in getting the Agriboard panels up on the Maidman Residence. This shot was taken a couple days ago. The second floor roof should be on as soon as the weather breaks. Weather forecast: Rain for the next nine days. Good luck out there guys!
Saturday, December 4, 2010
Diaz Barn Refurbishing
The Diaz Barn isn't quite complete but these two photos give a sense of the change. The new painted corrugated siding is the same profile as the adjacent Agriboard structure. The existing eaves were in marginal condition and cutting them back eliminated the expense of repairing in kind and allowed us to share the eave treatment utilized on the main body of the Agriboard Residence. New Sierra Pacific windows and doors were also installed on both structures.
Subscribe to:
Posts (Atom)